Financier
Government of Kenya
KCB Bank of Belgium
Contractor
CG Holdings Belgium
Scope
Construction of the 50km 132kV double circuit transmission line from Kilimambogo to Thika and the 27km single circuit transmission line from Thika to Githambo, with two substations at Thika and Githambo.
Benefit
Increase access to electricity, addressing the challenges of low penetration, low connectivity, high losses and poor quality of power with Kiambu County.