| Transmission Master Plan 2026-2045 |
Download |
| Public Disclosure of Privately Initiated Proposal for Development of Transmission Lines by Pabari Investment Limited, ENCOMM Power Rental Solutions Limited and AEE Power Ventures S.L. |
Download |
| PPP Energy Transmission Infrastructure Project to be Undertaken by Consortium of Africa 50 and Powergrid Corporation of India |
Download |
| Transmission Master Plan Vol 2 |
Download |
| Transmission Master Plan Vol 1 |
Download |
| Response To Arm Engineering Limited Questions Regarding The Proposed Design, Finance, Construction, Operations And Maintenance Of Two (2) Projects By Consortium Of Africa50 And Powergrid Corporation Of India. |
Download |
| EPRA Stakeholder Engagement Meeting Kisumu Q&A 8th To 9th October |
Download |
| Clarification on Queries Received on 5th - 9th Oct 2025 Public Participation & Stakeholder Engagement Exercise For Africa 50 PIP - Kakamega & Baringo |
Download |
| 400kV Loosuk-Lessos and 220kV Kisumu-Kakamega-Musaga Transmission Lines Feasibility Study |
Download Link |
| Project Information Manual (PIM) for Transmission Projects Procured Under the PPP ACT, CAP 430 Through a PIP by Consortium of Africa 50 & Powergrid of India |
Download |
| Stakeholder Engagement report for the Proposed Lessos-Loosuk TL |
Download |
| Public Participation and Community Engagements Q&As |
Download |
| Stakeholder Engagement Report for the Proposed Kisumu-Musaga TL |
Download |
| Public Participation in Nairobi on PIPs Report |
Download |
| Internal Stakeholder Engagement Forum Report |
Download |
| External Stakeholder Engagement Forum Report |
Download |
| PPP Stakeholder Engagement Plan |
Download |
| PPP Communication Plan |
Download |
| Statement on the Growth of Power Transmission Infrastructure & the Public-Private-Partnership (P.P.P) Financing Option |
Download |
| Strategic Plan 2023-2027 |
Download Link |